{{.Title}}
{{.Description}}
TO DISCUSS {{.}}
{{end}}{{end}}{{include "header.html"}}
{{include "nav.html"}}{{if .ThemesExt}}{{with index .ThemesExt "brand_name"}}{{.}}{{else}}CIRCUIT FIELD{{end}}{{else}}CIRCUIT FIELD{{end}} / ASSEMBLY PLANNING
Industrial control & sensor interfaces
Prototype to small batch
FIELD NOTES
01—04
{{if .ThemesExt}}{{with index .ThemesExt "hero_intro"}}{{.}}{{else}}Explore the decisions that shape an industrial interface-board build.{{end}}{{else}}Explore the decisions that shape an industrial interface-board build.{{end}}
Fictional demonstration. Capabilities and project terms require confirmation.
{{end}}{{end}}01 / DOCUMENTS Which board, BOM and drawing revisions belong together?
02 / MATERIAL Who supplies each part, and who approves an alternative?
03 / REVIEW What should the first article reveal before a pilot?
04 / TEST Which interfaces, methods and limits are in scope?
01 / ASSEMBLY & OWNERSHIP
Start with the design package and define the work around it: assembly method, material ownership, unresolved questions and the proposed handover.
Customer-supplied, sourced or shared materials are agreed by project. Substitutions require written agreement from both parties.
{{with Column "assembly"}}Explore all assembly examples {{end}}ASSEMBLY / SELECTED DISCUSSIONS
{{$assembly := ColumnContents "assembly" 4}}{{if $assembly}}{{range $assembly}}{{.Description}}
TO DISCUSS {{.}}
{{end}}{{end}}Assembly examples are not available yet.
{{end}}02 / FROM PACKAGE TO REVIEW
Preparation, first-article review and testing are conversations about specific evidence and decisions. The articles below introduce possible questions, not verified capabilities.
Revision, placement and material responsibility.
{{.Description}}
Preparation articles are not available yet.
{{end}}{{with Column "capabilities"}}All capabilities questions ↗{{end}}Identify checkpoints, open issues and decision owners.
{{.Description}}
NPI articles are not available yet.
{{end}}{{with Column "npi"}}All NPI questions ↗{{end}}Agree access, procedure, limits and what remains untested.
{{.Description}}
Testing articles are not available yet.
{{end}}{{with Column "testing"}}All testing questions ↗{{end}}A checklist is not a test result. Inspection, electrical checks and functional testing require a project-specific method and agreed acceptance criteria.
03 / CONTEXT & READING
Explore application topics alongside practical questions to bring to a project discussion.
APPLICATIONS / {{if .ThemesExt}}{{if index .ThemesExt "demo_mode"}}IMAGINED{{else}}CONTEXT{{end}}{{else}}CONTEXT{{end}}
Illustrative scenarios, not customer projects or deployed products.
{{end}}{{end}}{{$industries := ColumnContents "industries" 4}}{{if $industries}}{{.Description}}
Application scenarios are not available yet.
{{end}}GUIDES / FAQ
Guides are not available yet.
{{end}}04 / START WITH CONTEXT
Share a written outline of the stage, quantity, material split and desired test scope. Agree a secure channel for sensitive design files.